Remediation Services
We have recently completed the design and installation and are operating the following remedial systems:
- A 75-well air sparging system and a 46-point emulsified oil injection enhanced bio-barrier at the Peak Oil/Bay Drums Superfund Site in Tampa, Florida.
- A 13-well soil vacuum extraction system at the D’Imperio Superfund Site in New Jersey.
- A 46-well bio-sparging system at the Fike/Artel Superfund Site in Nitro, West Virginia.
- Completed the work plans for a 200 gpm groundwater treatment system for metals and VOCs for the WR Grace Superfund Site in Acton, MA. We will be responsible for completing conceptual design submittal, RFP for 100% design, evaluation of 100% design submittal, construction oversight, start up support and final system operations, and all field activities to support project investigations including pump tests, treatability studies and well installation.
- A 20-well dual vacuum extraction system at the Denver International Airport in Denver, Colorado.
- A 24-well air sparge/vacuum extraction system at a former dry cleaner site in Winter Haven, Florida.
- A soil removal/enhanced bioremediation project at a food distribution warehouse in Jacksonville, Florida.
- A soil removal action and chemical oxidation (Fenton’s) project at the former Stapleton International airport in Denver, Colorado.
- A chemical oxidation project (potassium permanganate) at a former manufacturing facility in Berlin, Wisconsin.
- Radioactive drum excavation oversight at the Nuclear Metals Inc. Superfund Site in Concord, MA.
- Petroleum UST removal oversight for a nationwide client at sites in Florida, Georgia, Illinois, Indiana, and Wisconsin.